Experience
In the 10 years as General Manager of HEB Construction's Structures Division, Noel has overseen and worked on the following projects.
Bridges
-
Transmission Gully, NZTA, $800m, 26 bridges
-
Arras Tunnel + Memorial Park Wellington, NZTA, $150m Alliance
-
Tauranga Eastern Link, NZ Transport Agency $350m, 8 bridges
-
Ferrymead Bridge, Christchurch City Council, $20m
-
Rangiriri Rail Bridges, Kiwirail, $9m ECI
-
Papakura Interchange ECI, NZTA, $30m Bridge over SH1 Auckland
-
Atiamuri Bridge Replacement, NZTA, $21m ECI
-
Kopu Bridge, NZTA, Coromandel, $35m
-
Hobsonville SH18 Realignment, NZTA, $200m , 7 bridges
-
Awatere Bridge, Seddon, NZTA, $15m, road + rail bridges
-
Arahura Bridge, Hokitika, Kiwirail, $20m, rail + road bridge
-
Beaumonts Bridge, Manukau CC, $7m, road over rail bridge
-
Whau Creek Bridge, Kiwirail, $4m, 2 x rail bridges
-
Harania Creek Bridge, Manukau CC, $3m,
-
Northcote to Sunnynook Bridges, NZTA, $2m
-
Bridge 59, BOP Kiwirail, $2m
Wharves and Marine
-
Multipurpose Wharf Extension, Port Otago, $20m D&C
-
Waitangi Wharf, Chatham Is, Dept of Internal Affairs, $54m
-
Thorndon Wharf EQ Recovery, CentrePort Wellington, $20m ECI
-
Fergusson FZ Wharf Extension, Ports of Auckland, $8m
-
CQ2 Wharf, Lyttelton Port Co, $62m
-
CQ1 Wharf, EQ rebuild, Lyttelton Port Co, $20m ECI
-
Sulphur Point Wharf extension, Port of Tauranga, $26m D&C
-
Marine Precinct, Tauranga CC, $7m
-
Access to Water, Tauranga CC, $3m
-
Princes and Captain Cook Wharf Repairs, Ports of Auckland, $3m
-
Herrick Wharf reconstruction, Port of Napier, $40m Alliance
-
Royal Perth Yacht Club Marina, Perth Australia, $2m
-
Main Wharf North, Port Nelson, $4m
Water Retaining + Treatment Works
-
Mangere BNR Plant, Watercare Auckland, $120m D&C
-
Fred Thomas Drive Storage Tank, Watercare Auckland, $20m
-
Clarks Beach Reservoir, Watercare Auckland, $4m
-
Blenheim WWTP + Outfall Pipeline, Marlborough DC, $12m
-
Pines WWTP, Christchurch CC, $27m
-
Gisborne WWTP, Gisborne Council, $20m
-
Joyce Road Reservoir, Tauranga CC, $6m
-
Ohauiti Reservoir, Tauranga CC, $4m
-
Blenheim Reservoir, Marlborough DC, $4m
-
Palmerston North WWTP, CC, $8m
CONSTRUCTION LOGIC
From January 2018 Noel has provided design/construction innovation, constructability studies, construction methodologies, construction programming and/or detailed budget estimations (from 1st principle costing) on the following projects:
-
Lyttelton Port Tee Bay wharves – Lyttelton Port Company
-
Centreport Earthquake recovery works program – Centreport (working with T&T and Holmes)
-
Tarakohe Port development – Stantec
-
Eastland Port Wharves 6/7 Reconstruction and new Slipway – Eastland Group
-
Whanganui Commercial Wharves Reconstruction – Whanganui District Council
-
Downtown Auckland Ferry Basin, Public Space Wharf Deck and Cruise Ship Dolphins – Downtown Joint Venture (for Auckland Transport)
-
New Wharf 6 – Port Napier
-
PrimePort new and existing Wharves Construction – Opus (for PrimePort Timaru)
-
Opotiki Harbour Entrance – HEB and T&T (for Opotiki District Council)
-
Glen Innes to Tamaki Drive Shared Pathway and Bridges – Stantec (for Auckland Transport + Kiwirail)
-
Waikato Falls Bridge Upgrade – RoadLab (for Genesis Energy)
-
Gladstone Bridge extension – Stantec (for Gisborne District Council)
-
Ngauranga to Petone Cycleway Reclamation – NZTA with large consenting team
-
Northport Dry Dock berthing facility and Western Expansion – WSP (for Northport)
-
Seaview Wharf reconstruction (approach wharf, main wharf + dolphins) - Fuel Unloading – CentrePort (working with Holmes)