Experience

Prior to forming Construction Logic, in the 10 years as General Manager of HEB Construction's Structures Division, Noel has overseen and worked on the following projects.

Bridges

 

  • Transmission Gully, NZTA, $800m, 26 bridges

  • Arras Tunnel + Memorial Park Wellington, NZTA, $150m Alliance

  • Tauranga Eastern Link, NZ Transport Agency $350m, 8 bridges

  • Ferrymead Bridge, Christchurch City Council, $20m

  • Rangiriri Rail Bridges, Kiwirail, $9m ECI

  • Papakura Interchange ECI, NZTA, $30m Bridge over SH1 Auckland

  • Atiamuri Bridge Replacement, NZTA, $21m ECI

  • Kopu Bridge, NZTA, Coromandel, $35m

  • Hobsonville SH18 Realignment, NZTA, $200m , 7 bridges

  • Awatere Bridge, Seddon, NZTA, $15m, road + rail bridges

  • Arahura Bridge, Hokitika, Kiwirail, $20m, rail + road bridge

  • Beaumonts Bridge, Manukau CC, $7m, road over rail bridge

  • Whau Creek Bridge, Kiwirail, $4m, 2 x rail bridges

  • Harania Creek Bridge, Manukau CC, $3m,

  • Northcote to Sunnynook Bridges, NZTA, $2m

  • Bridge 59, BOP Kiwirail, $2m

 

Wharves and Marine

 

  • Multipurpose Wharf Extension, Port Otago, $20m D&C

  • Waitangi Wharf, Chatham Is, Dept of Internal Affairs, $54m

  • Thorndon Wharf EQ Recovery, CentrePort Wellington, $20m ECI

  • Fergusson FZ Wharf Extension, Ports of Auckland, $8m

  • CQ2 Wharf, Lyttelton Port Co, $62m

  • CQ1 Wharf, EQ rebuild, Lyttelton Port Co, $20m ECI

  • Sulphur Point Wharf extension, Port of Tauranga, $26m D&C

  • Marine Precinct, Tauranga CC, $7m

  • Access to Water, Tauranga CC, $3m

  • Princes and Captain Cook Wharf Repairs, Ports of Auckland, $3m

  • Herrick Wharf reconstruction, Port of Napier, $40m Alliance

  • Royal Perth Yacht Club Marina, Perth Australia, $2m

  • Main Wharf North, Port Nelson, $4m

  •  

  • Water Retaining + Treatment Works

 

  • Mangere BNR Plant, Watercare Auckland, $120m D&C

  • Fred Thomas Drive Storage Tank, Watercare Auckland, $20m

  • Clarks Beach Reservoir, Watercare Auckland, $4m

  • Blenheim WWTP + Outfall Pipeline, Marlborough DC, $12m

  • Pines WWTP, Christchurch CC, $27m

  • Gisborne WWTP, Gisborne Council, $20m

  • Joyce Road Reservoir, Tauranga CC, $6m

  • Ohauiti Reservoir, Tauranga CC, $4m

  • Blenheim Reservoir, Marlborough DC, $4m

  • Palmerston North WWTP, CC, $8m

CONSTRUCTION LOGIC

 

From January  2018 Noel has provided design/construction innovation, constructability studies, construction methodologies, construction programming and/or detailed budget estimations (from 1st principle costing) on the following projects:

  • Lyttelton Port Te Bay wharves – Lyttelton Port Company

  • Centreport Earthquake recovery works program – Centreport (working with T&T and Holmes)

  • Tarakohe Port development – Stantec (current)

  • Eastland Port Wharves 6/7 Reconstruction and new Slipway – Eastland Group (past and current)

  • Whanganui Commercial Wharves Reconstruction – Whanganui District Council

  • Downtown Auckland Ferry Basin, Public Space Wharf Deck and Cruise Ship Dolphins – Downtown Joint Venture (for Auckland Transport)

  • New Wharf 6 – Port Napier

  • PrimePort new and existing Wharves Construction – Opus (for PrimePort Timaru)

  • Opotiki Harbour Entrance – HEB and T&T (for Opotiki District Council) – ongoing

  • Glen Innes to Tamaki Drive Shared Pathway and Bridges – Stantec (for Auckland Transport + Kiwirail)

  • Waikato Falls Bridge Upgrade – RoadLab (for Genesis Energy)

  • Gladstone Bridge extension – Stantec (for Gisborne District Council)

  • NZTA Ngauranga to Petone Cycleway Reclamation – NZTA with large consenting team

  • Northport Dry Dock berthing facility and Western Expansion – WSP (for Northport)

  • Seaview Wharf reconstruction (approach wharf, main wharf + dolphins) - Fuel Unloading – CentrePort (working with Holmes)

  • Takitimu Northern Link (new bypass motorway including 9 bridges) – Fulton Hogan/HEB Joint Venture (for NZTA)

  • Eastland Port Wharf 7 (procurement of construction contractor through Early Contractor Involvement) - Eastland Group

  • Northport Berth 5 - WSP (for Northport)

  • Auckland Harbour Bridge Shared Path – NZTA

  • Ferry Terminal Redevelopment (iRex Project) at Picton and Wellington – Kiwirail, Port Marlborough, CentrePort

  • Te Bay Wharf – WSP (for Lyttelton Port Company)

  • Rangipo Sluice Armouring Project – Genesis Energy

  • Waikawa Marina extension – Port Marlborough

  • Eastland Port Wharf 8, Breakwater Extension, Reclamation + Sea Revetment – Eastland Group

  • Port Timaru Temporary Wharf – Sustainable Infrastructure (for Antarctica NZ)

  • State Highway 58 improvements – Stantec (for NZTA)

  • Hillside Mechanical Workshops upgrade – Kiwirail

  • Wi Neera to Onepoto Shared Pathway – Porirua City Council

  • Papakura to Pukekohe rail line electrification – Kiwirail

  • Bridge 16 MID foundation replacement – Kiwirail

  • Bridge 52 MID rail beam replacement - Kiwrail

  • Bridge 88 & 89 MID span replacements – Kiwirail

  • Bridge 45 SNL span replacement – Kiwirail

  • Bridge 192, 195,196,197 replacements - Kiwirail

  • Rail Bridge Span Standardisation project - Kiwirail

  • Port Nelson Travel Lift – WSP

  • West Mineral Sands Company Loadout Facility – Westport – WSP

  • Foxton Flood Mitigation Scheme – Horizons District Council

  • Whanganui South Mole Reconstruction – Horizons District Council

  • Matiu Somes Island Wharf - Dept of Conservation

  • Port of Napier, Breakwater Repairs

  • Akaroa Wharf replacement - Christchurch CC

  • Hamilton Pukete Wastewater Treatment Plant Extension - Hamilton CC